1. Home
  2. Packaging glossary
  3. Lead time
Production & ordering

Lead time

Also known as: production lead time, delivery time, turnaround time, lead time for pouches

Lead time is the total time from order and artwork approval until the packaging is ready for delivery.

Lead time is the time from order and artwork approval until the packaging is ready to ship, usually quoted in working days.

What it includes

  1. Prepress: file checks, placement on the dieline, separations and approval.
  2. Plate or cylinder making (not needed for digital).
  3. Material sourcing if special films are required.
  4. Printing.
  5. Lamination and adhesive curing, which takes several days and cannot be rushed without risking delamination or odour.
  6. Slitting and pouch making with zippers, valves and other features.
  7. Quality control, packing and dispatch.

What extends it

Incomplete artwork, slow approvals, many designs, non-stock materials or spouts, peak seasons and extra proof rounds.

First order vs repeat

First orders take longer because of plates, proofs and approvals. Repeats without artwork changes are usually faster, but still plan them well before stock runs out.

Note that the quoted lead time often means ready to ship from the factory; transport and warehouse receiving may come on top, so build in a safety margin.

Tips

Confirm in writing when the clock starts, share launch dates early, supply print-ready vector files and ask whether transport time is included.

Frequently asked

How long does printed pouch production take?

It depends on print method, format, material availability and workload; first orders take longer than repeats.

Why can't lamination curing be skipped?

Uncured adhesive can cause weak bonds, delamination and odour, so curing time is essential.

Related terms

Let's choose your packaging together

Work out the price for your size now, or ask our team which structure suits your product.

All terms